M9 Olympic - Ataköy metro line is the 13 km long subway project on the European side of Istanbul and the first station Olympic at Ataköy. The lines and stations between the Olympic - Ikitelli Industry were built and opened in 2013. It will be given to the operation of this line when the metro between the Olympic - İkitelli Industry operated by M3 line is opened. The current building is between İkitelli Sanayi and Ataköy. Olympic - Ataköy metro line consists of 14 stations. It is planned to complete the construction of İkitelli Sanayi - Ataköy section in 2019. Immediately after the whole line İ.B.B. It is planned to be opened by.
Olympic
Ziya Gökalp Neighborhood
Ikitelli Industry: (M3)
Masko
Bahariya
Mehmet Akif
Halkalı Street
Hoca Ahmed Yesevi
Architect Sinan: (M1B)
East Industry
Kuyumcukent
Çobançeşme
Yenibosna: (M1A)
Atakoy: (Marmaray)